PT. PLN (PERSERO) DISTRIBUSI JAWA TENGAH |
| UPP PURWOKERTO |
| Faktor Meter kWh meter | = | 400 | ||||
| Faktor Meter kVArh meter | = | 400 | ||||
| Stand meter bulan ini (LWBP) | = | 08915 | dan WBP = | 03040 | kVArhmeter = | 1892 |
| Stand meter bulan lalu (LWBP) | = | 07920 | dan WBP = | 03030 | kVArhmeter = | 1255 |
| Jadi: | ||||||
| selisih pembacaan meter LWBP | = | 8915 - 7920 | = 995 | |||
| selisih pembacaan meter WBP | = | 3040 - 3030 | = 10 | |||
| selisih pembacaan meter kVArh | = | 1892 - 1255 | = 637 | |||
| Maka: | ||||||
| Pemakaian kWh LWBP | = | 400 x 995 | = 398.000 kWh | |||
| Pemakaian kWh WBP | = | 400 x 10 | = 4.000 kWh | |||
| Pemakaian kVArh | = | 400 x 637 | = 254.800 kVArh | |||
| Jumlah kVArh bebas | = | 0,62 x (398.000 + 4.000) | = 249.240 kVArh |
| Maka rekening yang harus dibayar adalah : |
| Biaya Beban | = | ( 630.000 VA / 1000 ) x Rp 16.500 / kVA |
| = | Rp 10.395.000 | |
| Biaya Pemakaian kWh | ||
| WBP | = | 4.000 kWh x Rp 314.9 / kWh |
| = | Rp 1.259.600 | |
| LWBP | = | 398.000 kWh x Rp 262.4 / kWh |
| = | Rp 104.425.200 | |
| Biaya kelebihan pemakaian kVArh : | = | (254.800 - 249.240 ) x Rp 364 |
| = | Rp 2.023.840 | |
| Jumlah Biaya Beban + Biaya Pemakaian | = | Rp 118.113.640 |
| Pajak Penerangan Jalan | = | 3% x Rp 118.113.640 |
| = | Rp. 3.543.410 | |
| Biaya Meterai | = | Rp. 6.000 |
| Maka Total Rekening yang harus dibayar | ||
| = | Rp 121.663.050 | |