|
|
PT. PLN (PERSERO) DISTRIBUSI JAWA TENGAH |
| UPP PURWOKERTO |
| Pemakaian kWh | = | stand meter bulan ini stand meter bulan lalu |
| = | 12277 - 8152 | |
| = | 4.125 kWh | |
| Biaya Beban | = | ( 16500 VA / 1000 ) x Rp 17.000 / kVA |
| = | Rp 280.500 | |
| Biaya Pemakaian | = | 4.125 kWh x Rp 489 / kWh |
| = | Rp 2.017.125 | |
| Jumlah Biaya Beban + Biaya Pemakaian | = | Rp 2.297.625 |
| Pajak Penerangan Jalan | = | 3% x Rp 2.297.625 |
| = | Rp. 68.930 | |
| Biaya Meterai | = | Rp 6.000 |
| Maka Total Rekening yang harus dibayar | ||
| = | Rp 2.372.555 | |