Page 9 of the Story of THE CABIN!

Right Click on any image and then Left Click on "Open Link in New Window" to view Larger image!

 It's June 30th and I've installed the carpet and some peal and stick (whose stick had left)

to the kitchen area....

Here's another shot of same

and still another!

The fridge was a real mess, having been in storage for over 3 years

and it took me a whole day to get it and clean it but it fired right up and is working now.

The drawers are actually built for a waterbed

but they work well here.

Can't see much from here but I've spent a lot of time on this end...mostly wiring!

Probably the biggest thing is the fact I now have running water! Had to install a new 220 pump

 

and control box with new lines going to the house

At present though, after repairing the old line to the building I;m using it until I get the floor of the addition in. The white line below is my water main.

 

Money's the biggest holdup at the moment. I've another (est.) $2500 to gather before I can do the addition (which includes the bathroom). The original cabin (10" X 21") is, without niceties (like drywall and a ceiling and insulation) already completed, and I can't go any farther until I can raise the roof of it for the Loft to be installed, then I can start the addition. Pray my car will sell, as I do not want to be roofing in August! That's it for now!
 