It's June 7th and I just got back from finishing
the West exterior wall...here's a shot in the Beginning!
|
And here's the inside now.
|
you can see the Original South wall leaning up
against the new Posts and the Beam for the tall ceiling in this
one too.
|
This is the inside of the North Wall, behind
all this stuff is plywood that covers the insides of the 3 long
windows that are up here.
|
Here's the West Wall now. All but about 2 strips
of siding are on and the trims in place and ready for the White
Aluminum Covering.
|
Same Pic as before but you can see the old wall
laying in the foreground.
|
This is the South East Corner. The S. is to your left in
the picture and it's wall is laying against the building and
at the top of the E. Wall you can still make out where the chimney
came out for the coal oil furnace.
|
This would be the SE corner on the inside...
|
Around to the North Side again!
|
|
|