Copyright 1998 by Rob Perry and NorthStarr Productions
All Rights Reserved
NorthStarr Casting
Nicholas Lea
Ann Heche
Nightmare in Diablo Canyon an Original Screenplay by ROB PERRY and GEOFF WEINBERG PROLOGUE In 1998 the NUCLEAR REGULATORY COMMISSION known as the NRC announced that the licensed reactors in the United States generated over 2,000 thousand GIGA-WATT-HOURS. Although reactor plant designs share many similarities, each can be considered unique. The unique characteristics of each plant design vary by vendor, licensee, design, and plant location. There are four reactor vendors, forty-eight licensees and eighty different designs. The 150 reactors licensed to operate during 1998 have accumulated over Four-thousand reactor-years of experience. Nuclear Energy is here to stay! NRC NEWS FADE IN EXT. MAJOR NATIONAL TELEVISION BROADCAST EXT. NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. A distinguished looking Afro-American lady Dr. Debra Jackson. JACKSON (Steps up to the podium) Hello, I'm Dr. Debra Jackson the Chairman of the NRC. And as you know we have the responsibility for regulating nuclear energy plants. Recently we commissioned a state of the art COMPUTER SYSTEM and it's the fulfillment of a 7 year plan to build a new computer to assist us in keeping watch over all of our nuclear power plants, allow me now to introduce MOTHER, the code name we've given to the system. It's designed to detect problems in any of our commercial Reactors and to automatically shut down any of our reactors in a matter of minutes. Mother will bypass standard regulatory process's which as you know, can take hours or days! Applause from the audience. JACKSON (Cont.) Thank You. My colleague Dr. Nelson will now take your questions.. CUT TO: EXT. DIABLO CANYON REACTOR ONE - CALIFORNIA EXT. MASTER CONTROL ROOM Two Nuclear Scientists are working late into the night. DR. MOSS MORRISON the operations manager is on the phone with the operating manager of DIABLO CANYON REACTOR TWO, DR. BRANT JILLIAN. MORRISON Well, did you see "herself" on the broadcast last night? JILLIAN (V.O.) Yes, she's very impressive, isn't she! MORRISON The first time MOTHER shuts down my Reactor is the day I'm out of here! JILLIAN (V.O.) Yeah, me too! MORRISON They're at least three generations behind on the UNIX release their running in D.C. JILLIAN (V.O.) Don't kid me like that! MORRISON I kid you not! CUT TO: EXT. RIVER BEND REACTOR ONE - LOUISIANA, EXT. MASTER CONTROL ROOM Two Nuclear Scientists are working late into the morning. DR. GEORGE GOETZ the operations manager has a large plush office and is on the phone with the operating manager of RIVER BEND 2, DR. SHERI JENSEN. GOETZ Sheri, pick up, its me! GOETZ Sheri picks up. JENSEN (V.0.) Hey, did you see Dr. Shirley on the TV last night? GOETZ Yes, I sure did! JENSEN There's a lot going on with the Y2K upgrades. CUT TO: EXT. NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. EXT. NATIONALLY TELEVISED BROADCAST The quarterly reviews is in session and the speaker is Dr. Joe Willis from the NRC Washington office. He's a tall man in his middle fifties, wearing a colorful bow tie. WILLIS The Generic Safety Issues, (NUREG-0933) contains issues identified by NRC Computer Based Digital System Failures, and the IPE Database Basic Query Program NUREG-1021. He waits, looks around. WILLIS (Cont.) Do we have any questions? A well dressed beautiful slender young lady stands up and gets the attention of the speaker. WILLIS Yes, the lady in the third row. CHASE Yes, sir I'm CANDICE CHASE, the Illinois Project leader for the Y2K Compliance Committee. Based on the information I'm Reading, we believe our reactors at BRAIDWOOD, BYRON, CLINTON, DRESDEN, and LA SALLE COUNTY is in dire jeopardy, and I want to get some answers from the Committee today. CLOSE ON WILLIS He develops a nauseating look on his face. CHASE We have a serious concern for the NRC Computer System called MOTHER. WILLIS Yes, and what is your concern? CHASE Sir, the concern the State of Illinois has for MOTHER is that when the clock strikes midnight in the year 2000 we in the State, are not sure what MOTHER is going to do! WILLIS Ms. CHASE, you should not concern yourself with this anomaly, it's a Federal problem and we are on it. CHASE Sir, with all respect to all the Federal agencies and the NRC I SAY BULLSHIT TO THAT! WILLIS I'm sorry, Ms. CHASE, the standing committee has met all guidelines and more. CHASE Simply, Dr Willis, your MOTHER computer system regulates everything we do, and we recently heard hat Mother is built on a platform that is 3 Generations behind, in operating system structure, and cannot upgrade. Can you or the committee confirm this? WILLIS Miss, Mother, is the vital link for the welfare and safety of the people of United States. Willis point into the audience. Man in the fifth row stands up to speak but is cut off by Candace CHASE. WILLIS You Sir in the Fifth Row. CHASE (Trying to control her voice) Excuse Me, (A beat.) MOTHER is using a version of UNIX that is seven years old! Didn't you hear me before, you cannot upgrade to Y2K compliance, unless you install a Y2K patch or go to a newer version of UNIX! Talking into the Audience. WILLIS So? CHASE So? What kind of a response is that? Don't you know ANYTHING about COMPUTERS OR SOFTWARE? WILLIS Please try and control yourself Ms CHASE! CHASE We are nine months away from the end of the millennium and we don't have any idea what mother is going to do to our reactors. Can you just imagine midnight in the year 2000 the entire United States of America will evaporate in one big nuclear cloud, and all you can say is SO! A level of discussion starts in the audience. Volume increases. Willis turns around and addresses one of his staff, a thin short Oriental man. He stands up and walks up to the podium. WILLIS (Hits the gavel) Ladies and Gentlemen, this is DR. KEN WONG CHIEF INFORMATION OFFICER of the NRC. I will let the best informed expert in the field answer your question. WONG, a very refined oriental man moves to the Podium. CHASE Dr. WONG, when are you going to update MOTHERS operating system? WONG We'll upgrade the System very soon. CHASE That doesn't tell us squat, Dr. WONG, we need an estimated completion date, you know ECD. WONG We plan to update the system no later than Thanksgiving Weekend. CHASE Why wait that long, Professor WONG, what if you have bugs in the new version, you only have 30 days to fix it and what if you can't fix it? WONG, turns around and says something to Willis. WONG Ms. CHASE, we don't expect any problems. CHASE I don't think any of the Nuclear Reactors will be up on midnight year 2000! Ms. CHASE grabs her portfolio case and walks out of the meeting. CUT TO: EXT. WASINGTON DC HOTEL ROW RAINY NIGHT DR. GOETZ is seen getting out of his cab and heading for the hotel lobby. CANDICE CHASE is waiting for him, under the bus shelter close by. She see's him, and runs over, getting soaking wet in the rain. CHASE George! GOETZ turns, looks up, see's Candy CHASE. CHASE Hello Stranger. He holds her arm, happy to see her, with a quick look around him. GOETZ Quick, lets get out of the rain. CHASE Where can we talk? GOETZ Let's go into the lobby, and find a quiet corner where we can talk. CUT TO: EXT. DIABLO CANYON REACTOR ONE - CALIFORNIA EXT. MASTER CONTROL ROOM Two Nuclear Scientists are meeting in a conference room. DR. MOSS MORRISON manager of reactor one and DR. BRANT JILLIAN manager of reactor two. MORRISON More bad news, Dr. WONG still hasn't brought Mother off line! JILLIAN (V.O.) No kidding, have you heard the Latest about MOTHER. MORRISON I'm afraid to ask. JILLIAN (V.O.) The day before the Thanksgiving Holidays we have to provide a dump of our operating system and it has to match a mirrored dump done two days later after they do the fix. MORRISON Yes, I know about that. (He cringes) JILLIAN (V.O.) Hell, if you don't do it Moss, they'll pull your license. They've been working on this system for over seven years. And now when they're finally getting around to making MOTHERS UNIX SYSTEMS Y2K ready and at the last minute, go back to a test done three years ago? It doesn't make sense! JILLIAN covers his face in a panic look CUT TO: EXT. DIABLO CANYON REACTOR ONE - CALIFORNIA EXT. MASTER CONTROL ROOM INT. CONFERENCE ROOM Seated. Moss MORRISON, Brant JILLIAN, Greeting Candy CHASE. MORRISON Welcome Candice, but why do you want to move to California. CHASE I've lived in Illinois all of my entire life, and it was time for a WONGe, besides the fact that I sometimes wished that I didn't live in my late fathers shadow. MORRISON The great T.T. CHASE. What would this industry be without his efforts in safety and procedure. Who knows what would have happened if he had not stepped in at 3 mile. Suddenly, the sound of a klaxon breaks the silence, it gets louder, the door to the conference room opens the room shakes Red Alert Lights, and Audio Signals commence. MORRISON Shit, what now!. In runs Saul Marks, the operations supervisor. MORRISON Yes, Saul what's happening ? MARKS Moss, Brant, Mother just pulled SIX control rods, and Reactor 1 is shutting down, as we speak. Brant and Moss look at each other, eyes wide open. MORRISON picks up the red phone on the table and press's a button. The room shakes again. JILLIAN It felt like something just tripped the intake pumps. MORRISON How much time do we have? MARKS We have about 10 minutes to save her before she shuts down the reactor core. MORRISON (looking sick) Ten minutes, grab your hat, lets get down there. Candy see's them scrambling for hard hats, and she address's MORRISON. CHASE Can I go? MORRISON Sure, Get her a hat that fits, She's Hired! INT: DIABLO ONE OPERATIONS ROOM MORRISON gets off the wall phone on the engineering floor. CHASE and MARKS are studying the schematics. MORRISON That was the NRC and they've given me a lame excuse on why they pulled rods on Reactor One. Listen to this, they said there was a spike in the CON-EDISON NORTHEASTERN POWER TIE. Yeah right! MORRISON throws his hard hat across the room, bouncing on the freshly polished tile floor. JILLIAN Who did that come from? MORRISON Dr. WONG. MOTHER shuts down my Reactor and it's blamed on CON EDISON! MORRISON grapples with this, holds the back of his neck, finding the whole explanation difficult to accept. The room starts to shake again and all the red lights and klaxons are going off a second time. MORRISON Where the hell did that come from? JILLIAN I'm on it, (A beat.). (He scans through a few screens) Something just tripped the outtake valves! MORRISON picks ups the red phone on the desk and punches a code he then asks for a code yellow alert. MORRISON Saul, what's happening to the pumps. MARKS Mother tripped the out-take pumps! We're trying to bring them up now. MORRISON How much time do we have? MARKS If we don't get them started in the next fifteen minutes, we'll have to shut down the reactor! MORRISON slams the phone down and gets a sick look on his face. JILLIAN How much time do we have? MORRISON (Looking very sick) Fifteen minutes, and no time to Loose! MORRISON, JILLIAN and CHASE are talking to MARKS all are looking at blueprints. MORRISON Brant, see if you can help Saul! Candy, do you know anything about Westinghouse Reactors? CHASE Do I know anything about Westinghouse reactors? MORRISON (Cuts in) Well, as you can see we're Manually trying to start the pumps, to avoid further disaster any way we can override using the shutdown override? I've already signed on with my password so go for it! CHASE unfolds the other drawings and finds a DOG EAR'D one. She spreads it out and follow lines and diagrams with her fingers. She sits down at the computer monitor and keyboard. CHASE Let me see what we can do! Ok, Main Turbine Generator Rated Output 1106 MWE, Ultimate Heat Sink, Supply to Main Turbine Condenser, Pacific Ocean Ultimate Heat Sink , Supply to ECCS Service Water System Pacific Ocean PWR Type, 4-loop, Westinghouse Turbine Generator, Arch Westinghouse and PG&E. She pulls another drawing with the upper edge marked in red. CHASE (Cont.) Containment-Large Dry @ 47 PSIG's Steam Generator Model, U-Tube Westinghouse Model 51, Steam GENS 4, Number of Main Steam Isolation Valves, 4. MORRISON is totally amazed at the knowledge CHASE has about Westinghouse reactors. She runs keyboard and monitor like she was connected to the operating systems. CHASE Lets see Fuel rods, 193, Number Fuel Rods per Assembly 264, Type of Fuel Cladding Material, Zirconium. MORRISON Well, what do you think, we have about five minutes before we have to dump it! Are you proficient in UNIX and core control systems? CHASE Am I proficient? Here we go, Chemical and Volume Control System. She types in some access commands. CHASE (Cont.) Centrifugal Pumps, two, Positive Displacement Pumps, one. Ok, almost there. Pump Flow Rate, 150 gallons per minute at 2510 pressure per square inch and 98 GPM at 2510 PSID with High Head Safety! She continues to type in control commands. MORRISON Module three has the Injection System. CHASE (really revving) Two Pumps, CVCS Centrifugal - Charging the Pumps, Flow Rate, 150 GPM at 2510 PSID! Its Clicking! Check Line! Dr. JILLIAN and Dr. Marks head to MORRISON. They are amazed at the way Candy is pumping the keyboard. CHASE (Cont.) Pump Shutoff Head, 2565 PSID. Hold It Ok, now slow the intermediate head, safety injection systems-Up. Pumps Two - Six. Flow Rate, 425 GPM at 1085 PSID. OK HERE WE GO PUMP SHUTOFF HEAD, ON! A loud hum is heard, a klaxon shrikes and the room starts to vibrate. Brant and Marks get edgy, MORRISON stays calm, and gets a twinkle in his eye! CHASE Ok, PSID 300, 350, 400, 600. What's this, it's asking for an override pass word. She looks around the room and Dr. Marks speaks up. MARKS The pass word is PLEASE. CHASE Oh, that's original. She types it in and waits, everyone looks on. CHASE Dr. Marks, are you sure! Is it case sensitive? MARKS Yes, it is, I'm sorry. All upper case! CHASE Ok guys, this is where they separate the men from the boys! CHASE MAINWATER FEEDER. (A beat.) Rock and roll it took it! Ok, up we go, 800, 900, 1100 OK were holding at 1520 PSID! Both Low Head Injection System Pumps 3000 GPM at 155 PSID, Pump Shutoff Head at less than 165 PSIG. Green lights start coming on all the panels in the control room. The crew is jumping up and down and yelling. (panic) CHASE (cont.) Ok, now the Residual Heat Removal System, RHR and LHI Pumps STAT. She looks over at MARKS to do his part. CHASE (Cont.) Yes, both Pumps at Shutoff Head And Intermediate Head OK! MARKS Confirms-with a Nod, CHASE (Cont.) MAIN FEED-WATER CONDENSATE. All three Pumps We're rocking and rolling. Now CONDENSATE BOOSTER. All Pumps ok! Sound of Pumps Cranking Up. Pan on all the scientists faces and see the pure admiration of this performance by this young lady. CHASE Both pumps on and Startup Feed water, check. Start up auxiliary, both Pumps ok. Decay Heat Aux. Feed water Supply Source, ok! WERE UP AND RUNNING!! JILLIAN (Confirms the Screens) Containment, Dry, 47 PSIG. Steam Generator, U-Tube, Steam Through Line Moving into Vacuum 1-6 at 4200 BTU's, Isolation Valve Steam. The three men look convinced that everything is back under control, they glance over at Candy CHASE with high professional admiration. CUT TO: GO TO CHAPTER TWO
Copyright 1998 by Rob Perry and NorthStarr Productions
All Rights Reserved