AUGUST 2007 |
< PREVIOUS > | < NEXT > |
Ago-2007: Before return to Argentina I met with Cabinho on board of FIU by last time, before his departure to Australia. An excellent person who (Luis too) provide me the necessary technical support. Thanks Cabinho!! | 29-Ago-2007: Glassing the port side water tank lid with the gap for the lid already done. This is for the case of besmirch some water not wetting the cushion seat. | 29-Ago-2007: Here is the support structure for compartment lid adjoining of the portside tank. |
29-Ago-2007: Port side tank completely glassing. Again, the whitest spots are putty that remaindas below. | 29-Ago-2007: As in the tank starboard side, put two breakwaters. Here with fillets ready and one of three hands of epoxy resine done. | 29-Ago-2007: Pasting sides of styrofoam of 25 kg/m3 and 5 cm thick. |
29-Ago-2007: Block of wood with pipe drain on the conservative placed. | 31-Ago-2007: Interior of the conservative glassed with cloth of 300 gr/cm2 and epoxy. | 31-Ago-2007: View of conservative structure totally glassed in its interior, before placing the cover of the kitchen table. |
31-Ago-2007: These us. |
AGOSTO 2007 |
< ANTERIOR > | < SIGUIENTE > |