< HOME >
AUGUST 2007
< PREVIOUS > < NEXT >
Ago-2007: Before return to Argentina I met with Cabinho on board of FIU by last time, before his departure to Australia. An excellent person who (Luis too) provide me the necessary technical support. Thanks Cabinho!! 29-Ago-2007: Glassing the port side water tank lid with the gap for the lid already done. This is for the case of besmirch some water not wetting the cushion seat.

29-Ago-2007: Here is the support structure for compartment lid adjoining of the portside tank.

29-Ago-2007: Port side tank completely glassing. Again, the whitest spots are putty that remaindas below. 29-Ago-2007: As in the tank starboard side, put two breakwaters. Here with fillets ready and one of three hands of epoxy resine done.

29-Ago-2007: Pasting sides of styrofoam of 25 kg/m3 and 5 cm thick.

29-Ago-2007: Block of wood with pipe drain on the conservative placed. 31-Ago-2007: Interior of the conservative glassed with cloth of 300 gr/cm2 and epoxy.

31-Ago-2007: View of conservative structure totally glassed in its interior, before placing the cover of the kitchen table.

31-Ago-2007: These us.

< PRINCIPAL >
AGOSTO 2007
< ANTERIOR > < SIGUIENTE >