Table # 4.3

SEWER GG/

Descriptive

Polpulation

Avg.Daily

Peak flow

Storm

Design

Design

Exist. Dia

Remarks

Category

Flow

allowance

flow

Dia

 

 

(person)

m3/d

m3/d

m3/d

m3/d

(mm)

(mm)

 

Museum

400

15.14

60.56

60.56

136.26

69

150

satisfactory

Center of

Excellence

40

6.06

24.23

24.23

54.54

Sum =190.8 m3/d

=0.00221 m3/s

Sewer line FF/:

Table # 4.4

Descriptive

Category

 

Chemistry

Dept.

Primary

School

Annexy block

Ali mardan

Hall

Qasim hall

Khalid

Hall

New hall

 

 

Population

(Persons)

 

30

 

400

 

416

 

112

 

200

112

 

100

Avg.daily

Flow

(m3/d)

1.14

 

7.57

 

62.99

 

17

 

30.28

17

 

15.14

Peak

Flow

(m3/d)

4.542

 

30.28

 

252

 

68

 

121.12

68

 

60.56

Storm

Allowance

(m3/d)

4.542

 

30.28

 

252

 

68

 

121.12

68

 

60.56

Design

Flow

(m3/d)

10.26

 

68.13

 

566.91

 

153

 

272.52

153

 

136.26

Design

Diu

(mm)

 

 

 

 

 

 

183

Existing

Dia

(mm)

 

 

 

 

 

 

150

Remarks

 

 

 

 

 

 

 

 

Under-sized

Sum =1360.1 m3/d

=0.01574 m3/s

4.3.1 WET WELL AND PUMP AT DISPOSAL STATION NO. 1:

TABLE 4.5

Total Sewage

Flow in

Wet well

 

 

 

 

 

 

 

Designed

Capacity

Of wet well

 

 

 

 

 

 

Existing

Capacity

 

 

 

 

 

 

 

 

 

Pump Capacity

 

 

 

 

 

 

 

 

 

 

Designed

 

Existing

 

Suction Pipe

 

 

 

 

 

 

Delivery Pipe

 

 

 

 

 

 

Suction Pipe

 

 

 

 

 

 

Delivery Pipe

 

 

 

 

 

 

0.0367

5.507m3

 

 

20.4 m3

0.0283 m3/s

 

 

 

225mm

225mm

100mm

100mm

Comments:

The capacity of wet well existing is all right even it is quite more than the required.

The design capacity of wet well is given by the following formula:

V =Tmin .Q/4

The value of Tmin. is usually greater than 5 minutes, in our design procedure we have taken it 10 minutes.

Total incoming sewage to this disposal station is 0.0367 m3/s but the capacity of pump is 1 cu sec (0.0283 m3/s) so pump is equate but the suction and the delivery pipes are under sized.

Note:

The velocity in the suction pipe ranges from 1-1.5 m/s in the delivery pipe ranges from 2-2.5 m/s. in the design procedure we took 1.25 m/s for suction pipe and 2.25 m/s for delivery pipe.

 

SEWAGE DISPOSAL STATION #2:

This disposal point is situated near the colony just before the boundary wall of the University. Trunk sewer KK’ designates it as shows in the fig. 5.2

At this point there is no pump used for pumping the sewage. The sewage is being disposed to the near by passing WASA sewer under gravity.

We tabulated the hydraulic calculations for each sewer and saw whether the Sewer are adequate or under sized.

Trunk sewer JK/ :

Table # 4.6 (ON NEXT PAGE)

Descriptive

Category

Popula-tion

(Persons)

Avg. daily flow

(m3/d)

Peak flow

(m3/d)

Storm allow-ance

(m3/d)

Design flow

(m3/d)

Design dia

(mm)

Existing

Dia

(mm)

Remarks

Liaquat

Hall

Quaid-e-Azam hall

Sir syed hall

Iqbal hall

Zafar hall

Sports-complex

Madina

Canteen

P.D. Office

Bachelor

Flat

(44F-type+44Etype)

6-P type

54 servant quarters

10-R type

8-L type

202

 

202

 

202

202

130

200

 

100

 

50

32

 

704

 

 

48

432

 

80

64

30.58

 

30.58

 

30.58

30.58

19.682

30.28

 

15.14

 

1.893

9.084

 

199.85

 

 

13.63

122.63

 

22.71

18.17

122.33

 

122.33

 

122.33

122.33

78.73

121.12

 

60.56

 

7.57

36.37

 

799.4

 

 

54.51

490.54

 

90.84

76.672

 

122.33

 

122.33

 

122.33

122.33

78.73

121.12

 

60.56

 

7.57

36.37

 

799.4

 

 

54.51

490.54

 

90.84

76.672

 

 

 

 

 

 

275.22

 

275.22

 

275.22

275.22

177.14

272.52

 

136.26

 

17.04

81.76

 

1798.65

 

 

122.67

1103.67

 

204.39

163.53

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

357

 

 

 

 

 

 

 

 

 

 

 

 

 

 

375