Sewer MM/

Table # 4.7

Descriptive

Population

Avg.

Peak

Storm

Design

Design

Exist.dia

Remarks

Category

 

Daily

Flow

Allowance

Flow

Dia 

 

 

 

 

Flow

 

 

 

 

 

 

(Person)

(m3/d)

(m3/d)

(m3/d)

(m3/d)

(mm)

(mm)

 

Computer

100

3.785

15.14

15.14

34.065

 

 

 

dept.

 

 

 

 

 

 

 

 

Arch.dept.

250

9.46

37.85

37.85

85.14

 

 

 

Chemical.

250

9.46

37.85

37.85

85.14

 

 

 

Dept.

 

 

 

 

 

114

225

Satisfactory

8.c type

64

18.17

72.67

72.67

160.53

 

 

 

House

 

 

 

 

 

 

 

 

Girls

72

10.9

43.6

43.6

98.1

 

 

 

Hostel

 

 

 

 

 

 

 

 

I.T Dept.

100

3.785

30.28

30.28

34.065

 

 

 

New compu-

100

3.785

30.28

30.28

34.065

 

 

 

ter. Dept.

 

 

 

 

 

 

 

 

SUM = 534.11 m3/d

= .0062 m3/s

Trunk sewer L/K:

This sewer carries discharge of LL’ and M’L hydraulic calculations of sewer LL’ are carried out in the following table.

 

 

 

 

 

 

 

 

Sewer LL/:

Table # 5.8

Descriptive

Population

Avg.

Peak

Storm

Design

Design

Exist.dia

Remarks

Category

 

Daily

Flow

Allowance

Flow

 Dia

 

 

 

 

Flow

 

 

 

 

 

 

(Person)

(m3/d)

(m3/d)

(m3/d)

(m3/d)

(mm)

(mm)

 

Habib Bank

15

0.57

2.27

2.27

5.13

 

 

 

Admin Block

300

11.36

45.42

45.42

102.24

 

 

 

Elect.Dept.

1000

37.85

15.14

15.14

340.65

 

 

 

Islamic.Dept.

100

3.785

15.14

15.14

34.065

 

 

 

Jamia Mosq.

300

11.36

45.42

45.42

102.51

 

 

 

Library

500

18.925

75.7

75.7

170.325

351

300

Under Sized

Public Health

150

5.68

22.71

22.71

51.12

 

 

 

Dept.

 

 

 

 

 

 

 

 

Civil.Engg.

1000

37.85

15.14

15.14

340.65

 

 

 

Dept.

 

 

 

 

 

 

 

 

24 - Family

192

54.51

218.02

218.02

490.59

 

 

 

Flat

 

 

 

 

 

 

 

 

10 – P type

80

22.71

90.84

90.84

204.39

 

 

 

Sum =1814.67 m3/d

Discharge from disposal point #1 =3172 m3/d

Total flow =5014 m3/d =0.058 m3/s

 

Sewer M/L/:

This sewer carries discharge from MM/ and adjacent area. The hydraulic calculations are given below.

 

 

 

Table # 4.9

DescriptiveAvg.

Peak

Storm

Design

Design

Exist.dia

Remarks

Category

 

Daily

Flow

Allowance

Flow

dia 

 

 

 

 

Flow

 

 

 

 

 

 

(Person)

(m3/d)

(m3/d)

(m3/d)

(m3/d)

(mm)

(mm)

 

(49) - R,L.P

392

111.279

445.12

445.12

1001.5

 

 

 

Type

 

 

 

 

 

 

 

 

15 - P type

120

34.065

136.26

136.26

306.6

227

375 

Satisfactory

12 - L type

96

27.252

109.1

109.1

245.27

 

 

 

 

 

 

 

 

 

 

 

Sum =1553.37 m3/d

Discharge from MM/ =534.11 m3/d

Total =2087.5 m3/d

=0.0242 m3/s

TRUNK SEWER L/K:

Discharge at L/K = discharge from LL/ + discharge from M/L/

5014 +2087.5 =7102 m3/D

=0.0822 m3/d

Design dia =418 mm

Existing dia =310 mm

Comments:

This sewer line is under sized from hydraulic point of view.

 

 

 

Sewer KK’:

Discharge at KK/ =discharge from LK/ + discharge from JK/

=7102 +5178.5 =12280.5 m3/d

=0.142 m3/s

Design dia =550 mm

Existing dia =450 mm

Comments:

This sewer line is under sized from hydraulic point of view.

 

CLICK HERE TO CONTINUE