23 Jul
07,
Well the gravel is
finished and packed, the vapor barrier is completed and the 2x4 framing is
finished. as you view theses pictures you will see that the 2x4's are drilled
and rebar has been driven through them the rebar extends through to extend
beyond the outside wall by one inch it then has almost 2 ft extending to the
inside this now supports the wire mesh. See below. Now one section at a time
will be poured with cement. Tom will be sprinkling a cement dye (color Leather )
on the top and leaving it to sort of model a little, then I have a natural rock
pattern form that you press into the cement to cut a pattern with. The sections
are almost 4ft in width. See pictures. (tomorrow we start pouring - rented a
cement mixer)
I totally appreciate
the advise from SluryGuy and my other friends on Cheap Shelters
yahooGroups.com
Nelda
See how the wire mesh
sits up on the rebar? it works.. locks the walls to the cement floor pad. Locks
the 2x4 framing to the Cement floor, locks the roof to the cement floor.
You'll see how as I
gert the framing up.
We are mixing and
pouring off the floor so that we do not have to carry the mixed cement so far...
More pictures in a few
days... after we pour about half so you can see it better