We have a large lot and house, however, the two car garage is filled to capacity with my Mopar restoration stuff and my 70RR convertible. So late last year I embarked on a crusade to build a separate garage. Since the property and area is zoned for horses, I decided to purchase a Raised Center Aisle (RCA) barn similar to the one pictured at left, with a cement floor suitable for storing vehicles and restoration gear. | |||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
30Nov04: signed a contract with MD Barns of Ontario CA for a 24ft x 36ft steel barn. The contract specified the buyer arranges for the foundation. In my case a 4in slab with 10 foundation piers. So, in December I began clearing the area....and the old sheds... | ![]() |
||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
Dec04 Sheds demolished and excavation underway |
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
9Jan05: Then THE RAINS CAME>>> 35inches in SOCAL, leaving little time for excavation work. Local radar picture on 9 Jan: left is regional view, right is closeup showing squal line just west of my location. Pretty intense.. | |||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||
12Jan: The quagmire after the storm. The record rainfall left only a day or two every couple weeks in Jan/Feb/Mar where the area was dry enough for tractor work. | |||||||||||||||||||||||||