PROGRESS
Currently, the layout is not operational. I have several buildings up and my 65th Street Yard is wired and ready to go. I am not a rich man so this project will probably take as long as it would to build the prototype. I have constucted two mock-ups for my L structure, one of wood and one of plastic. I may use each on different lines, but most likely the plastic structure, as it has been sturdier. The layout is being stored for now until we can get more space, so it can be kept out of reach from the scale modeler's worst nightmare: the cat!
   I am going to have the cars made soon and post pictures of what's happening in my little world.
HOME

ORIGINS

EQUIPMENT

MAPS

LINKS

Printable View
PLANS
           
Stations and Transit Structures
    65th Yard
   
63rd/Allen Station
   
47th Street Station
    35th Street Transfer Station
   
Roosevelt Station
    47th Subway Terminal
    Arena Station
   
35th Street (RO-JKT)
    Cermak Station
    71st Street Station
   
Elevated Structures
    Eastman right-of-way
    Richfield Subway
   
Washington Grove Subway Entrance


                    Buildings
Arena
St. Christopher Hospital




                       
Cars

6000
 
1-50 (just a Pic)
  2000
  2200
  2400
  7500
  5000
  3500
1-50 Car Side here
See the horribly botched project!

Also a shot of the yard from an unfinished platform