23 May 07
HI,
Well, I'm back
working. I had to clean in front of the house (Eastside), so I could have gravel
delivered. Oh, maybe I should explain? The ground inside of the house needed to
be leveled, but it also needed a water barrier for the cement floor.. so I
removed all the cinder blocks and am using pea gravel to level the floor then
down goes the water barrier, then the cinder blocks / bolts more gravel then
2x?'s in front of /across the doorways and fill with cement.





I'm using the 2x4 to
acquire a level surface. Set it up then use the level to insure it is correctly
positioned and fill the gravel up to the bottom.