< HOME >
OCTOBER 2007
< PREVIOUS > < NEXT >
03-Oct-2007: View of Sirius with the pulpits placed.

03-Oct-2007: View of guides to withdraw the panels already cut off.

03-Oct-2007: Tank of diesel with the checking top placed.
03-Oct-2007: Roof panels placed.

03-Oct-2007: Making the inferior frame of the central hatch

03-Oct-2007: Another view.
04-Oct-2007: It's time to cover internally the Sirius with a 4 mm plywood cedar. Here is observed the port side.

04-Oct-2007: Detail of a locker framed.

09-Oct-2007: Here it is the bow, starboard side .
09-Oct-2007: Frame of central hatch finished.

09-Oct-2007: Idem, bow hatch.

09-Oct-2007: Covering lockers of aft starboard side.
09-Oct-2007: Idem, port side.

09-Oct-2007: Covering starboard side flank.

09-Oct-2007: Idem port side flank.
10-Oct-2007: General view.

11-Oct-2007: Flor putty frames!.

12-Oct-2007: Navigation table coated and drawers framed.
14-Oct-2007: Navigation table with the door framed and cover edges placed.

14-Oct-2007: Electric panel cover and VHF/CD already framed.

14-Oct-2007: Opening of table well squared.
14-Oct-2007: Locker over conservator also framed.

14-Oct-2007: Starting to manufacture the inclinable garbage bin.

14-Oct-2007: I made a notches for placing supermarket bags !.
14-Oct-2007: Front of garbage bin finished.

14-Oct-2007: Garbage bin opened.

14-Oct-2007: Finally take courage and I decided to place the chine plates!. Aspect after send them to polish.
15-Oct-2007: View of starboard chain plate after placed and bolting.

15-Oct-2007: External chine plate aspect. here I glue some pieces of wood making a "pool" around it. This space will be filled with epoxi and fiber filaments. Later, everything will be glassed with 3 layer of 350 gr/m2 cloth.

26-Oct-2007: Inside I made a little bulkhead (in front of kitchen sink) with a handle.
26-Oct-2007: Inside towards bow, I put the roof panels and, at the same time, I made some finished.
< HOME >
OCTOBER 2007
< PREVIOUS > < NEXT >