| 01-Sep-2007: Port side tank finished. The lid was pasted with Sikaflex and screwed. | 01-Sep-2007: Pasting the kitchen table cover and holding firmly the conservative isolant. |
03-Sep-2007: Front of port side cabinet ready. |
| 03-Sep-2007: I glue two 1"cedar pieces behind of electric panel to screwing the positive and negative junction plates . | 03-Sep-2007: View of the kitchen table structure and the opening made for the tilting garbage bin. |
05-Sep-2007: Through hull bronze fittings of 1" and 1/2" for sink waste and external water inlet/conservative drain. |
| 05-Sep-2007: Another view of trhough hull fittings below of kitchen table. | 05-Sep-2007: Front of cabinet over the kitchen table placed. |
06-Sep-2007: Front of kitchen cabinet pasted. |
| 06-Sep-2007: Placing a wooden base for the two pumps (sea/river water and fresh water). | 07-Sep-2007: Finaly making the gas installation!. Here can be observed the 3/8" copper pipe outgoing trhough transom. |
08-Sep-2007: Kitchen furniture finished, only lack paint it. The holes are to permit air entry and exhaust to the oven. Also its observed (left side) the gas valve (in the gas box there is another one). |
| 08-Sep-2007: The kitchen is already on place. | 08-Sep-2007: Light the fire inside of Sirius!. |
10-Sep-2007: Kitchen table sink placed. Its also observed the conservative lid already made (lack the hinges and lock). |
| 10-Sep-2007: Putting the structure for motor compartment cover. | 10-Sep-2007: View of diagonal reinforcements for the cover. All of panels can be removed except that be in contact with the floor. |
10-Sep-2007: Keel model receiving the structure for bulb. |
| 10-Sep-2007: Another view. | 11-Sep-2007: General structure of bulb ready. Now, I must sanding!. |
11-Sep-2007: Pasting the step of the removal panel of the cover motor. |
| 11-Sep-2007: Lower detail of the step. | 11-Sep-2007: General view of cover motor structure. |
11-Sep-2007: Panel with step ready on its place. |
| 12-Sep-2007: Placing the guides for slip panels. | 12-Sep-2007: Due Cabinho suggestion I removed the first step (that I maked fix) and then make another but removal. When put the motor the work will be more easy!. |
14-Sep-2007: General view of the modified step and front of cabinet below the external step. |
| 14-Sep-2007: Placing the structure for the bathroom furniture. | 14-Sep-2007: Another view. Here placing the floor supports. |
14-Sep-2007: Cutting the guides to remove panel with the step. |
| 18-Sep-2007: Storage sector structure ready. Also can be observed the diesel tank lid. | 18-Sep-2007: Bathroom furniture structure and view of floor where will be placed the toilet. |
20-Sep-2007: Bathroom sink on its place. |
| 20-Sep-2007: Inside of diesel tank glassed with 2 layers of 300 gr/m2 cloth and epoxi. | 20-Sep-2007: Tank lid with block of wood for passage of 8 mm stainless steel pipes (suction, return, cleaning and venting). |
20-Sep-2007: View of removal floor lid that will support the toilet. |
| 20-Sep-2007: Placing the 8 mm pipes on the wood block of the diesel tank lid. | 20-Sep-2007: Helping with a lamp I accelerate the epoxi process. |
26-Sep-2007: Keel model finaly finished and ready to go to the melt!!. |
| Sep-2007: View of ironworks under construction. | Sep-2007: Pulpits. |
Sep-2007: Aft pulpit. |
| Sep-2007: Impregnating the holes with epoxi for the pulpits screws. | Sep-2007: My "assistant" Flor and me during pulpit placing. |
Sep-2007: Posing and testing the pulpit firmness (with no many thrust!!). |