WET THE TURKEY


 

 Equipment Needed:      3 - 50’ lengths of 1 1/2” hose
                                         
1 - 1 1/2”  nozzle
                                         
1 - 2 1/2” to 1 1/2” wye
                                         
1 - 50’ length of 2 1/2” hose 

Fire Gear Needed:        Boots and Helmet 

Number of People:       Five (5) 

1.   The event will begin at the sound of the judge’s whistle. 

2.   The five (5) member team will be behind the starting line.  Three rolls of 1 1/2 inch hose and a nozzle will be lying on the ground behind the starting line.  Hose must be in an approved IFSTA roll. 

3.   At the sound of the judge’s whistle, the team will unroll the hose, connect the nozzle, and connect to a 2 1/2 inch to a 1 1/2 inch gated wye located at the starting line. Pump pressure will be set at 100 psi. 

4.   After connections have been made, the line may be charged by opening the gated wye.  The nozzle man must have one foot inside a tire located 140 feet from the gated wye before he flows the water. 

5.   The nozzle man, using water from his line with one foot inside the tire, shall knock over three (3) cones at various heights; ground level, approximately 3 feet 6 inches and 2 feet. 

6.     The event will end when the third cone is knocked over. 

Org. Georgia Muster Association                                                                                             Updated 1997

Back Home Up Next