Home | Organization | Members | Minutes | Standards | Photos | Links | Meetings | Contact Us |
![]() |
TP&C Line Design |
Presentations |
TP&C July 26-30, 2009 |
ARCHIVED PRESENTATIONS
The following presentations have been archived. If you would like a copy of any one or two of these presentations, email your request to da.douglass@ieee.org OR math711@yahoo.com. If you you would like a complete set of the archived TP&C presentations listed, (more than 1 or 2), please send a $15.00 check made out to Carol Douglass. Send the check to 1324 Regent St., Niskayuna, NY 12309, USA. |
||
Title | Presenter/Session | Place/Date |
ASCE Activities | LYNCH TP&C/ESMOL |
Atlanta, 2009 |
NESC | BINGLE/REDING WG 7 |
Atlanta, 2009 |
Guide to Qualify High Temperature Conductors for Use on Overhead Transmission Lines | DEVE WG 2-6 |
Atlanta, 2009 |
IEEE Guide for Qualifying High Temperature Conductors for Use on Overhead Transmission Lines | DEVE WG 2-6 |
Atlanta, 2009 |
Cooperative Work with IEC TC7 and TC11(CIGRE SC B2.25) | COSMAI WG 2-6 |
Atlanta, 2009 |
ANSI ACS C119 Update | HARMS WG 2-6 |
Atlanta, 2009 |
CIGRE B2 Advisory Group A6 - Mechanical Aspects of Overhead Conductors and Fittings | HAVARD WG 2-6 |
Atlanta, 2009 |
High Temperature Splice Test on ACSS Conductor | PASINI WG 2-6 |
Atlanta, 2009 |
The Effective Lifetime of ACSR Full Tension Splice Connector Operated at High Temperature | WANG WG 2-6 |
Atlanta, 2009 |
Accuracy of Transmission Line Modeling Based on Aerial LiDAR Survey | LU/KIELOCH WG 4-5 |
Atlanta, 2009 |
Assessment of the Nigol-Barrett Theory of Compression Stress in the Aluminum Part of ACSR Due to Maximum Loading | RAWLINS WG 4-5 |
Atlanta, 2009 |
Note on Aluminum Compression Hypothesis | RAWLINS WG 4-5 |
Atlanta, 2009 |
Live Line Maintenance - A Management Perspective | WG9 | Atlanta, 2009 |
Existing Overhead Shield Wires Replacement Strategy | HATHOUT/VU WG9 |
Atlanta, 2009 |
The Cost of Doing Nothing - A Maintenance Case Study for Wood Poles | STEWART WG9 |
Atlanta, 2009 |
Guide for Collecting and Managing Transmission Line Inspection and Maintenance Data | ABBEY WG9 |
Atlanta, 2009 |
BPA Aging Overhead Asset: Condition & Risk Assessment | TPC/ESMOL | Atlanta, 2009 |
Non-Contract Real-Time Sensor System for Accurate, Secure, Wireless Monitoring of Critical HV Transmission Line Operating Parameters | PROMETHEAN DEVICES TPC/ESMOL |
Atlanta, 2009 |
Real-Time Rating of Overhead Lines with Software | BLACK TPC/ESMOL |
Atlanta, 2009 |
Professional Development Hours - Blank | . | Atlanta, 2009 |
Rational Design Equations for Aeolian Vibration of Overhead Lines | LU WG2-6 |
Pittsburgh, 2008 |
Comparison of Various Space Damper Specifications | ALDERTON WG2-6 |
Pittsburgh, 2008 |
Cooperative Work with IEC TC7 and and TC11 | TOM WG2-6 |
Pittsburgh, 2008 |
Connector Integrity Restoration | TAMM WG2-6 |
Pittsburgh, 2008 |
Guide to Qualify High Temperature Conductors for Use on Overhead Transmission Lines | McCOLLOUGH WG2-6 |
Pittsburgh, 2008 |
IEEE TF on Thermal Rating Models | DOUGLASS WG2-6 |
Pittsburgh, 2008 |
ANSI ASC C119 Connectors for Electric Utility Application Update | HARMS WG2-6 |
Pittsburgh, 2008 |
CIGRE Study Committee B2 | DOUGLASS WG2-6 |
Pittsburgh, 2008 |
524 IEEE Guide to Installation of Overhead Transmission Conductors | PROCTOR WG3 |
Pittsburgh, 2008 |
Strength Interaction Curves of Braced Post Insulators | LU WG3 |
Pittsburgh, 2008 |
Doubs-Dickerson 230 kV Reconductoring Project | MILLER, STEIGERWALD,MANCINI WG4-5 |
Pittsburgh, 2008 |
NESC | BINGLE/REDING WG-7 NESC |
Pittsburgh, 2008 |
Corrosion Protection Methods | HOLLOMAN | Pittsburgh, 2008 |
LiDAR Meets Vegetation Manager and an Engineering Geek - a Love Story | ROUSSELLE WG9 |
Pittsburgh, 2008 |
Guide for Collecting and Managing Transmission Line Inspection and Maintenance Data | ABBEY WG9 |
Pittsburgh, 2008 |
Guide for Increased Utilization of Existing Overhead Transmission Lines | LINDSEY WG9 |
Pittsburgh, 2008 |
Corona Testing of 765kV Insulator Assemblies Using the Voltage Gradient Method | KUFFEL/FREIMARK WG11 |
Pittsburgh, 2008 |
Electrical Losses & AC Resistance for Overhead Transmission Lines | DOUGLASS TP&C/ESMOL Joint Presentation |
Pittsburgh, 2008 |
Cascading Structure Failures | GHANNOUM Panel Session - Cascading Failures |
Las Vegas, 2008 |
Criteria for Longitudinal Loading | MIZE Panel Session - Cascading Failures |
Las Vegas, 2008 |
T2 Conductor - Esperience & State of the Art | DOUGLASS TP&C/Esmol Joint Session |
Las Vegas, 2008 |
The Prospect of Live-Line, In Situ Conductor Replacement | BARTHOLD TP&C/Esmol Joint Session |
Las Vegas, 2008 |
Development of Conductor Cleaning Technology for Installation of Compression Connectors | STEWART/KILE WG2-6 Conductors |
Las Vegas, 2008 |
3M ACRR Installation Shanghai, China | JACHIM WG2-6 Conductors |
Las Vegas, 2008 |
CEATI Presentation | HALDAR WG2-6 Conductors |
Las Vegas, 2008 |
AEP's 765 kV Transmission Line - Mechanical Considerations in Space-Damper Hardware Design | FREIMARK/PON WG2-6 Conductors |
Las Vegas, 2008 |
Conductor Integrity Restoration | TAMM WG2-6 Conductors |
Las Vegas, 2008 |
Pratical Discussion on Aeolian Vibration | FREIMARK/ZHU WG2-6 Conductors |
Las Vegas, 2008 |
Alternating Current Resistance of Helically Stranded Conductors | DOUGLASS WG2-6 Conductors |
Las Vegas, 2008 |
Mechanical Aspects of Overhead Conductors & Fittings | HAVARD WG2-6 Conductors |
Las Vegas, 2008 |
ANSI ASC C119 Connectors for Electrical Utility Application | HARMS WG2-6 Conductors |
Las Vegas, 2008 |
ACSR Twisted Pair Conductors | BAKER WG2-6 Conductors |
Las Vegas, 2008 |
Cooperative Work with IEC, TC7 and TC11 [CIGRE] | COSMAI WG2-6 Conductors |
Las Vegas, 2008 |
Localized High-Intensity Wind Loadings | GOODWIN WG4-5 Line Design |
Las Vegas, 2008 |
500 kV Lattice Tower Testing in India | RENWICK/PERRY WG4-5 Line Design |
Las Vegas, 2008 |
NESC | BINGLE WG7 - NESC |
Las Vegas, 2008 |
Eliminating Rule 250B District Loading | LYNCH WG7 - NESC |
Las Vegas, 2008 |
Guide for Collecting and Managing Transmission Line Inspection and Maintenance Data | ABBEY WG9 - Asset Management |
Las Vegas, 2008 |
Visual Indicators of Corrosion | NEAL WG9 - Asset Management |
Las Vegas, 2008 |
Uh Oh! The New Survey Data Doesn't Match the Old | LYNCH WG9 - Asset Management |
Las Vegas, 2008 |
Emerging Technologies - Friend or Foe | BERENSTEIN WG9 - Asset Management |
Las Vegas, 2008 |
Transmission Line Compaction - Overview | DAVIDSON Panel Session - Transmission Line Compaction |
Tampa, 2007 |
Design Parameters in Compact Line Design | COLLINS Panel Session - Transmission Line Compaction |
Tampa, 2007 |
Conductor Selection for Compact Lines | DOUGLASS Panel Session - Transmission Line Compaction |
Tampa, 2007 |
Management Issues | STEWART Panel Session - Transmission Line Compaction |
Tampa, 2007 |
Corona & Field Effects of Compact Lines | PHILLIPS Panel Session - Transmission Line Compaction |
Tampa, 2007 |
Asset Information Management System | STEWART Panel Session - Transmission Line Compaction |
Tampa, 2007 |
The Integrity of ACSR Full Tension Splice Connector at Higher Operation Temperature | WANG WG 2-6 |
Tampa, 2007 |
Field Vibration Study | WHAPHAM WG 2-6 |
Tampa, 2007 |
IEEE Std. 1368 2006: Guide for Aeolian Vibration Field Measurements of Overhead Conductors | ALDERTON WG 2-6 |
Tampa, 2007 |
A Hard Look at Accelerated Aging Through Thermal Cycling | TAMM WG 2-6 |
Tampa, 2007 |
Accpetance Testing of HTLS Conductors | DEVE WG 2-6 |
Tampa, 2007 |
Update on Standards: STD 664-1993 & STD 563-1978 | CLARK WG 2-6 |
Tampa, 2007 |
Joint IEEE/CIGRE TF on Thermal Rating Methods | DOUGLASS WG 2-6 |
Tampa, 2007 |
Practical Discussion on AV on Single Conductors | ZHU WG 2-6 |
Tampa, 2007 |
ANSI ASC C119 Connectors for Electrical Utility Application | HARMS WG 2-6 |
Tampa, 2007 |
WG12 Final Report Highlights | DOUGLASS WG 2-6 |
Tampa, 2007 |
Report from IEC Standard Review Group | ALDERTON WG 2-6 |
Tampa, 2007 |
Live Line Reconductoring | BARTHOLD WG 3 |
Tampa, 2007 |
Micro-climate Ice Loading COTP | WG 3 | Tampa, 2007 |
Space Damper Failures | WG 3 | Tampa, 2007 |
IEEE-NACE Joint Corrosion Committee | WG4-5 | Tampa, 2007 |
Shunting Compression Fittings for High Temperature Operation | CUSTER WG4-5 |
Tampa, 2007 |
Best Practices to Evaluate Compact Designs | BERENSTEIN WG4-5 |
Tampa, 2007 |
NESC Working Group | BINGEL/REDING WG7 |
Tampa, 2007 |
Potential Changes for 2012 Edition of NESC | WG7 | Tampa, 2007 |
Guide Update for Line Inspection and Maintenance Data | WG9 | Tampa, 2007 |
IEEE -NACE Joint Corrosion Committee | WG9 | Tampa, 2007 |
Energized 500kv Insulator Change | WG9 | Tampa, 2007 |
NESC Panel Session - Strength & Loading | SLAVIN Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
New Rule 250D | CLEM Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
New Clearance Rules | REDING Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Example Applications of Rule 250C - Extreme Winds | SCULTZ Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Introduction of Fiber Reinforced Polymer Materials | BUSEL Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Re-written Strength & Loading Code | PETERS Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Extreme Wind Loading | WONG Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
ANSI 05.1-2002 | BINGEL Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Reliability-Based Design | SLAVIN Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Insulator Strengths | FREIMARK Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Significant Rejected Change Proposals | BINGEL Panel Session - Strength & Loading for Overhead Lines |
Orlando, 2007 |
Mechanical Behavior of Conductor Fittings | HAVARD WG 2-6 |
Orlando, 2007 |
Orange Book Update | HAVARD WG 2-6 |
Orlando, 2007 |
IEEE Guide for Qualifying High Temperature Conductors | McCULLOUGH WG 2-6 |
Orlando, 2007 |
Tacoma Narrows Crossing Construction | KIRCHMEIER WG 2-6 |
Orlando, 2007 |
JTF IEEE/CIGRE Thermal Model Update | DOUGLASS WG 2-6 |
Orlando, 2007 |
WG 12/26 Highlights 2006 | DOUGLASS WG 2-6 |
Orlando, 2007 |
Fatigue Capability of Conductor/Clamp Systems | CLOUTIER WG 2-6 |
Orlando, 2007 |
Testing of ACCR Deadends & Splices for High Temperature Operation | McCULLOUGH WG 2-6 |
Orlando, 2007 |
ACCC Conductor Update | BRYANT WG 2-6 |
Orlando, 2007 |
Galloping Video | HAVARD WG 2-6 |
Orlando, 2007 |
ANSI ASC C119 Activity Update | HARMS WG 2-6 |
Orlando, 2007 |
Fundamentals of Joint Use Attachment Agreements | DOLAN WG 8-10 |
Orlando, 2007 |
Panel Session on Joint Use of Utility Structures | HAUK WG 8-10 |
Orlando, 2007 |
Structural Design Considerations for Wood Utility Poles with Communication Attachments | LYNCH WG 8-10 |
Orlando, 2007 |
Joint Use of Overhead Transmission Line Structures | PETERS WG 8-10 |
Orlando, 2007 |
Acceptable Transmission Lines | DAVIDSON Panel Session - Acceptable Line Design |
Montreal, 2006 |
Aesthetics + Utilities | RAPHAEL Panel Session - Acceptable Line Design |
Montreal, 2006 |
Considerations in Designing a 550 Mile Long 765 kV Line | FREIMARK Panel Session - Acceptable Line Design |
Montreal, 2006 |
Finnish Innovative Towers | SEPPA Panel Session - Acceptable Line Design |
Montreal, 2006 |
Guide for Collecting and Managing Transmission Line Inspection and Maintenance Data | ABBEY WG9-Management of Existing Overhead Transmission Lines |
Montreal, 2006 |
APS Use & Installation of ACCR | RICHARDS WG2/6-Conductors |
Montreal, 2006 |
IEEE Guide for Qualifying High Temperature Conductors for Use on Overhead Transmission Lines | MCCOLLOUGH WG2/6-Conductors |
Montreal, 2006 |
A Focus on the Importance of Connectors | TAMM WG2/6-Conductors |
Montreal, 2006 |
ANSI ASC C119 - Connectors for Electrical Utility Application | HARMS WG2/6-Conductors |
Montreal, 2006 |
EPRI High Temperature Connectors Project | J. CHAN Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
ANSI C119.4: Connectors to Use Between Aluminum or Aluminum-to-Copper Bare Overhead Conductors | HARMS Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
IEC 61284: Overhead Lines - Requirements and Tests for Fittings | P. CHAN Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
ANSI C119.7 Draft Revision 1 | TAMM Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
IEEE Std. 1283: High Temperature Guide | REDING Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
CIGRE WG22-12: Joints on Transmission Line Conductors | HOFFMANN Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
"High Temperature Fittings for the Gap- Type Conductor System" - National Grid | HOFFMANN Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
"DOE-3M Demonstration Project" - Bonneville Power | REDING Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
"ACSS Conductors and Accessories" - Center Point Energy | HARMS Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
"High Temperature Connectors" - Western Area Power Administration | CLARK Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
Connector Testing for High Temperature Conductors | SPRINGER Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
High Temperature Conductor Hardware | PLP [Wapham] Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
Hi Temp Conductor Accessories | ACA [McCoy] Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
Efficient High Temperature Lubricants for Power Connectors Operating at Extreme Service Conditions | TYCO ELECTYRONICS [Ladin] High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
Accessories for GAP Type Conductor & Invar Core Conductor | J-POWER SYSTEMS/TYCO [Yonezawa, Beckter] Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
Some Experience with High Temperature Conductors | DULHUNTY [Roughan] Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
Connectors & Hardware for ACCC/TW | FCI/BURNDY [P. Chan] Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
High Temperature Connectors | HUBBELL [Tamm] Panel Session - High Temperature Operation of Connectors & Hardware |
Albuquerque, 2006 |
Update on ACCR Conductors | MCCULLOUGH WG 2/6 Conductors |
Albuquerque, 2006 |
ACCC Update | BRYANT WG 2/6 Conductors |
Albuquerque, 2006 |
EPRI Orange Book | HAVARD WG 2/6 Conductors |
Albuquerque, 2006 |
Increasing System Efficiency With High Temp Low Sag Conductor | ALBI-PACIFICORPWG 2/6 Conductors | Albuquerque, 2006 |
Task Force Proposal: Guide to Qualify HTLS Conductors |
DEVE WG 2/6 Conductors |
Albuquerque, 2006 |
Guide 664, Standard 738, Guide 1283 | REDING WG 2/6 Conductors |
Albuquerque, 2006 |
Installation of 3M's 795/kcmil 26/19 ACCR Conductor | BEAMON - XCEL ENERGY WG 2/6 Conductors |
Albuquerque, 2006 |
ACSS | THRASH - SOUTHWIRE WG 2/6 Conductors |
Albuquerque, 2006 |
WG-12 Report Highlights | DOUGLASS WG 2/6 Conductors |
Albuquerque, 2006 |
Integration of Engineering & Environmental Services in Project Development | Rogers - HDR WG 3 Conductors |
Albuquerque, 2006 |
Re-Engineering Transmission Lines for Capacity Increases | PNM WG 4/5 Line Design |
Albuquerque, 2006 |
Airborne Inspection Recording Systerm | ABBEY - EDM WG 9 Asset Management |
Albuquerque, 2006 |
Case Studies in Below Grade Assessment of Steel Structures | RANDLE WG 9 Asset Management |
Albuquerque, 2006 |
Acceptable Transmission Lines | DAVIDSON Joint TPC/ESMOL Presentation |
Albuquerque, 2006 |
Overhead Power Lines Real Time Monitoring - A Future Trend? | LILIEN Joint TPC/ESMOL Presentation |
Albuquerque, 2006 |
Guide for Selection of Weather Parameters for Bare Overhead Conductor Ratings | SEPPA Joint TPC/ESMOL Presentation |
Albuquerque, 2006 |
Upgrading Transmission Voltage - Planning Perspective | AUSTRIA Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Voltage Upgrade Assessments for Mechanical and Structural Concerns on Transmission Lines | GOODWIN Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Corona Issues with Voltage Upgrading | OLSEN Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Reliability Aspects in Transmission Line Voltage Uprating | CHISOLM Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Anti-Corona Conductor with Surface Treatment | MITO Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Compact Transmission Lines | MITO Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
BPA Upgrade Examples | REDING Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
230-345kV Line Uprating | LONGO Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Manitoba Hydro's Experience with an Upgraded 230kV Transmission Line | CHAN Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
115kV to 230kV Voltage Upgrade | DAVIDSON Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Upgrade of Johnstown-Grand Forks 115kV Wood H-Frame Transmission Line to 230kV | ROWE Panel Session - Voltage Upgrading of Existing Lines |
San Francisco, 2005 |
Update on Revision of EPRI Transmission Line Reference Book: Wind-Induced Conductor Motion "The Orange Book" | PON WG Conductors |
San Francisco, 2005 |
Sag-Tension Calculations | DOUGLASS WG Conductors |
San Francisco, 2005 |
Field Vibration Study on High Temperature Conductor | SKUNKLE WG Conductors |
San Francisco, 2005 |
ANSI ASC C119 Connectors Electric Utility Application | HARMS WG Conductors |
San Francisco, 2005 |
California Oregon Transmission Project | TRACY WG Construction |
San Francisco, 2005 |
Recent Bay Area Transmission Construction | HOPKINS WG Construction |
San Francisco, 2005 |
2007 NESC: Review of Comments to Change Proposals | BINGLE TP&C Changes to the NESC |
San Francisco, 2005 |
Transmission Line Avian Retrofits - Problems & Mitigation | NIELSEN WG Management of Existing Lines |
San Francisco, 2005 |
Transmission Line Design "For the Birds" | NIELSEN WG Line Design Methods |
San Francisco, 2005 |
Cigre Technical Brochure 244 Conductors for Uprating Overhead Lines |
DOUGLASS |
Las Vegas, 2005 |
BPA Experience and Potential Applications of HTLS |
REDING |
Las Vegas, 2005 |
HT and HTLS Conductors |
CLARK |
Las Vegas, 2005 |
The AEP System | FREIMARK Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
The BG&E System | NILES Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
The ComEd System | NANDI Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
The Matthew Gztacsr ("Gap-Type) Conductor | HOFFMANN Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
Hydro One | GOEL Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
Uprating Case Study | DOUGLASS Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
ACSS Reconductoring Solution | GENERAL CABLE Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
STACIR Conductor | LG CABLE Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
The Composite Conductor | 3M Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
GAP Type Conductor | J-POWER SYSTEMS CORP. Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
ACCC Conductors | CTC CABLE CORP Panel Session - High Temperature Low Sag Conductors. |
Las Vegas, 2005 |
High Temperature Invar Conductors | PHILLIPS-FITEL INC Panel Session - High Temperature Low Sag Conductors |
Las Vegas, 2005 |
Composite Pole Structures | LACOURSIERE TP&C/Esmol Joint Session |
Las Vegas, 2005 |
Finnish Novel Structure Designs | SEPPA TP&C/Esmol Joint Session |
Las Vegas, 2005 |
Ultra-High Strength Steel Core for ACSS and Heat Resistance of Zn and Zn5%AL Coatings | KRAJCOVIC TP&C/Esmol Joint Session |
Las Vegas, 2005 |
Voltage Upgrading of Existing Lines | LONGO TP&C/Esmol Joint Session |
Las Vegas, 2005 |
Hurricane Season 2004 on Progress Energy's Florida Transmission System (email for a copy) | DESANTIS WG Construction |
Las Vegas, 2005 |
ANSI ASC C119 Connectors for Electric Utility Application | HARMS WG Conductors |
Las Vegas, 2005 |
Variability of Conductor Temperature in a Two Span High Temperature Test Line at ORNL | SEPPA WG Conductors |
Las Vegas, 2005 |
EPRI "Orange Book Update" Progress Report | HAVARD WG Conductors |
Las Vegas, 2005 |
OPGW Design Trends and Short Circuit Current Calculation | DUTTA WG Conductors |
Las Vegas, 2005 |
Reconstruction of Transmission Lines in Iraq | MARLATT WG Line Asset Management |
Las Vegas, 2005 |
EMAT Device to Detect Broken Conductor Strands | GOODWIN WG Line Asset Management |
Las Vegas, 2005 |
Panel Session Introduction |
SEPPA |
Denver, 2004 |
Kinectrics Clearance Predictors |
CHISHOLM |
Denver, 2004 |
Wind Speed Measurements for Line Ratings |
DOUGLASS |
Denver, 2004 |
UK Wind Observations | HOFFMANN Panel Session - Weather Assumptions for Overhead Line Ratings |
Denver, 2004 |
Variation of Line Ratings Along Transmission Line Corridors | SALEHIAN Panel Session - Weather Assumptions for Overhead Line Ratings |
Denver, 2004 |
Non-Standard Conductor Ratings | SHAFFNER Panel Session - Weather Assumptions for Overhead Line Ratings |
Denver, 2004 |
Panel Session Closing | SEPPA Panel Session - Weather Assumptions for Overhead Line Ratings |
Denver, 2004 |
Weather Observation and Thermal Rating in a Short, High Temperature Test Line | DEVE Panel Session - Weather Assumptions for Overhead Line Ratings |
Denver, 2004 |
Probabilistic Line Ratings Using Monte Carlo Simulations | PRASAD WG Conductors |
Denver, 2004 |
Dual Logo Agreement | deCOURCELLE/HAASZ |
Denver, 2004 |
A Holistic Approach to Asset Management | SKLAR WG Management of Lines |
Denver, 2004 |
Probabilistic Ratings | HOFFMANN TP&C/ESMOL Joint Meeting |
Denver, 2004 |
High Temperature Guide | REDING TP&C/ESMOL Joint Meeting |
Denver, 2004 |
High Temperature Testing of Hardware | WHAPHAM TP&C/ESMOL Joint Meeting |
Denver, 2004 |
An Engineered Approach to Least Cost Service Life Extension Using Protective Coatings | ALBEN WG Management of Lines |
Denver, 2004 |