Data Mining and
Analog Devices Inc. Probably the best way to describe this project is through a Flow Chart. I was the leader of a team of five students, and the project spanned over one academic year. Due to confidentiality issues, I will only be able to post few slides from final presentation. The slides selected intentionally do not have real values on them. (View) |
|||||||||||||
![]() |
|||||||||||||
Airport Simulation Model: (selected pages from final report) Given number and capacity of flights, arrival and departure times, used ProModel and @Risk to develop simulation model of airport service system to decide on: number of screeners per line, number of X-Ray machines per line, number of metal detectors per line, and number of lines |
|||||||||||||
![]() |
|||||||||||||
Production Line Simulation Model: (selected powerpoint slides from final presentation) Used ProModel to find optimal number of redundant machines and best
layout of 8 serial machines that form a production line, taking into consideration
arrival rates, defect rates, random processing times, and buffers needed;
goal: ensure producing a number of units per year |