Life with the Robinson's

          Robinson's Home  Saddle Creek  . . . The Framing Almost Done

Other Pages

Saddle Creek...
  The Beginning
  The Plans
  The Construction Begins 
  The Framing
  Framing Part 2
  We Have Roof!
  Framing Almost Done

  

Trip to D.C.

Trip to Tahoe

 

 

Last modified: 06.11.2000

 

The House at Saddle Creek

Framing . . . Its Almost Done!

Except for completing the deck in the back, and putting in the stained glass windows in the front, the framing is almost done!

Next comes the drywall on the inside and the stucco on the outside.  The drywall contractor is behind schedule on the job prior to ours, so our timing is starting to slip ... looks like September, rather than July.  Oh well, don't sweat the small stuff right?

 

Click on the thumbnails below to see a full screen image. Use the "Back" button on your browser to return this page.

Description

Image

The concrete floor has had its initial coat of stain ... still a little more to do.  This detail looks sort of like a built in throw rug!

Detail of the concrete floor

Finally, finally, the stairs have been roughed in!  Up until now, we had to climb and 18' extension ladder to get to our bedroom.

Stairs to Master Bedroom

I LOVE these stairs!

Stairs from Great Room to Entranceway

Looking at the back of the house from down into the canyon  . . . trying to take the picture with one eye and watch for snakes with the other! Note that the windows on top aren't in yet.

The Back of The House

This shows some of the detail of the deck.

Deck Detail

Here, the windows are in.  By the time you read this, the deck should be complete.

 

Deck with Windows