Projects: |
-
Interoperability Tests Gn Interface
(Siemens SGSN GR2.0 – Ericsson GGSN R2.1).
- SoC (Statements of Compliance) Review for Gn
Interfaces.
-
|
Training Course:
|
- AXE System Survey.
- Keyprinciples of Datacom.
- German Course – Grundstufe 1,
Goethe Institut.
- GSM System Survey.
- AXE Platform BYB 501.
- AXE 10 Operation Handling.
- Protocol Analyzer.
- TCP/IP.
|
|
|
|
2.
Nokia
(Thailand) Ltd.
|
|
|
108 Bangkok Thai Tower (16th Floor),
Rangnam Road, Rajtevee, BKK 10400 THAILAND Tel: (66 2) 642 7020 Fax:
(66 2) 248 8258 |
Position:
|
FIS
Engineer. |
Working
period:
|
November
13, 2000
to April 8, 2001. |
Responsibility:
|
Braoadband
System. |
Job Description:
|
- Installation Supervision.
- Commissioning and Provisional Acceptance
Test.
|
Projects: |
- TA ADSL,
TelecomAsia, Bangkok, Thailand.
|
Training Course:
|
- Basic ATM and Advanced ATM.
|
|
|
|
3. DaimlerChrysler Rail Systems (Signal) Ltd.
(Adtranz) (now called
Bombardier Transportation)
|
|
|
3354/16-19 6th Floor, Manorom Building, Rama IV Road, Klongton,
Klongtoey, BKK 10110 THAILAND Tel: (66 2) 672 8290 Fax: (66 2) 671 7597
|
|
Position:
|
Software Engineer (Application Engineer).
|
Working
period:
|
September 7, 1998 to
November 8, 2000.
|
Responsibility:
|
Traffic Management System Department : EbiScreen
Product (Train Control and Supervisory System - COS) and
Interlocking System
|
Job Description:
|
- EbiScreen Adaptation Engineering.
- Design System Specification and
Interface Specification.
- System Testing & Commissioning.
- Product and Project Documentation.
- User Case Descriptions for Interlocking
System.
- Command Table for Interlocking.
-
Marketing
Support.
|
Projects: |
- Hua Mak Project, Bangkok, Thailand.
- Tianjin Metro Project, Tianjin,
People’s Republic of China.
- PEKTEN Project, Beijing, People’s
Republic of China.
- Railway System Simulator, Bangkok,
Thailand.
- Tehran Metro Project, The Islamic
Republic of Iran.
- Kyong-Ui Line Depot Project (Proposal),
Republic of Korea.
- Bombay Central Project (Proposal &
Budget Estimation), India.
- Senai-Tanjung Pelepas CTC Project (CTC
Specification), Malaysia
- Double Track Project (Tender in CTC section), Thailand
|
Working Abroad:
|
- Implementation, Integration, Installation COS
system of Tianjin Metro in Tianjin, China and to be guest speaker in
Shenyang, China during June 4, 1999 to July 2, 1999.
|
Training Course:
|
- Introduction of Signalling Principles and Technology.
- Introduction to Railway Signalling.
- EbiScreen Application.
- Basic Relay Interlocking.
- Basic C Programming.
- ISO Awareness Training.
|
|
|