CONCLUSION
Introduction
921 Earthquake
Reinsurer
Photo Gallery
Reinsurance Recovery
Current Status
Contact Us
Links
General Knowledge
Glossary
Reinsurance Program
The Losses
Claims Settlement
Conclusions
Profit Track
Promiseland had staged a speedy recovery and overcame difficulties caused by the 921 Taiwan Earthquake in September 1999 to spring back from losses to profit track.

So it is with reinsurance; it does not reduce losses but enable Promiseland to carry the consequences much easier. A stringent reinsurance program and a rationalization drive have raised the phoenix from the ashes.
You need Java to see this applet.