|
Day 3 - The Frame Raising Monday, October 16 |
||||||||||||||
|
Monday was a very productive day. By late morning, the basic framework of the middle and right bays had been raised. |
|
|||
|
Connecting
the bents together in the right bay.
|
![]() |
|||
|
Joe
and Ritch setting a valley rafter.
|
![]() |
|||
|
Another
shot of the valley rafter being put into place. That's Joe climbing to
new heights.
|
![]() |
|||
|
Putting
some final touches on the left bay.
|
![]() |
|||
|
The
status at the end of Monday.
|
![]() |
|||