Panel Unloading |
|||||||||||||
![]() |
||||||||||||||
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
As mentioned previously, unloading the panel trucks on Tuesday and Wednesday proved to be an event in itself. The mud and inexperienced panel truck drivers provided us with a variety of challenges. A
brief synopsis: The next day, panel truck #2 arrives - this time everything goes much more smoothly until this truck gets stuck backing out as well (so much for being told "Don't go over there!"). Excavator returns once more to save the day. |
||
![]() |
![]() |
![]() |
The
first panel truck arrives.
|
John
and Brian assess the situation.
|
Placing
the support braces for the lift.
|
![]() |
![]() |
![]() |
Lori
carries a small panel to the pile.
|
The
crane lifts a stack off the truck...
|
...and
over the top it goes.
|
![]() |
![]() |
![]() |
More
panels going over the frame.
|
Finally
- the last stack is lifted off!
|
The
rain stopped the framing that day.
|