Our To Do Items
Punch List

Carpenters 

 Front door - floor piece cracked

Builder 

 Front door -- put in bigger catch for lock -- scraping the woodwork as door closes.

Electricians

 Glad to be finished with those "Electricians with (bad) attitudes"

Plumbers

 Pay for fixing floor where they dribbled the hot water heater down the hall.

 Pay for fixing the carpet in the basement where they dropped solder on the carpet.

 Pay for the ceiling tiles they TORE down the basement.

HVAC

 Finished
Floor Guys

 Suzy BR - nail in floor by entrance 

 4th stair in second flight  - right side of tread - quarter-size piece of wood coming up

 2nd stair - extra drop of polyurethane.

Siding

 Finished

Drywall

 Finished

Painters-1  Finished
Painters-2  Finished
Shelving    Finished
Tile    Finished
Masons  

 Finished

Roofers

 Finished
Insulation  Finished