| Top Priority |
- Build the under porch storage area. Finish the flooring
and fill it up.
|
| Caulking |
- Re-caulk main level bathroom tub
- Caulk rest of old windows
- Caulk sidewalk and driveway cracks
|
| Spackling |
|
| Sanding |
|
| Priming |
|
| Painting |
- Paint Family Room and Hall walls and trim
- Touch up paint on outside doors
- Margaret to put stenciling paint on the side porch swing.
- Touch-up the painting of entire main level
- Touch up main level trim.
- Paint Tim's old closet
|
| Tiling |
- Fix tile around fireplace
|
| Wiring |
|
| Basement |
- Replace light switch at the bottom of the stairs
- Organize the basement boxes.
- Set up the sewing/craft room.
|
| Shopping List |
Fireplace tiles -- Find replacement tiles for the fireplace area
36x80 Storm Door
Light switch
|