Our To Do Items
Home

HousePics
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Q1Y2002
Our To Do Items
Punch List

Top Priority
  • Build the under porch storage area.  Finish the flooring and fill it up.
Caulking
  • Re-caulk main level bathroom tub
  • Caulk rest of old windows
  • Caulk sidewalk and driveway cracks
Spackling
  • All Done
Sanding
  • All Done
Priming
  • All Done
Painting
  • Paint Family Room and Hall walls and trim
  • Touch up paint on outside doors
  • Margaret to put stenciling paint on the side porch swing.
  • Touch-up the painting of entire main level 
  • Touch up main level trim.
  • Paint Tim's old closet
Tiling
  • Fix tile around fireplace
Wiring
  •  Put together Suzy's new/refurbished PCs

Basement
  • Replace light switch at the bottom of the stairs
  • Organize the basement boxes.
  • Set up the sewing/craft room.
Shopping List

 Fireplace tiles -- Find replacement tiles for the fireplace area

 36x80 Storm Door

 Light switch