logo.jpg (17015 bytes)
Information On Log Homes An affiliate site to The Timber Buyers Network


    Home - Tutorials - Assembly of the walls12 3 4 5

   

blackdone0001.jpg      Two rows of caulk should be used beteewn courses. If closed cell foam tape or backer rod is used route a groove for it in the bottom of the upper log so as not to form a water trap. When completed a bead of caulk should also be maintained along all joints.

 

Back

Contact Us | Add a Resource | Home | Tutorials | Tools | Projects