ULD STUDY & UPDATED ULD STATISTICS (AS PER SITA SYSTEM,AS ON 28th November 2005). ( Data Always Subject to update/Re-study) |
Type of ULDs |
STATUS as per SYSTEM |
CONTAINERS & TYPES |
PALLETS & TYPES (Controled by ULD) |
NEW PROCURED PAJ PLTs & AKE LD3s FOR POST HAJJ 2006 ARE NOW INCLUDED IN SYSTEM INVENTORY |
ULD Availability in System |
Untraced/Lost/beyond repair |
Systems Inventory |
AKE |
AVE |
PAJ |
PAP |
P1P |
P6P |
PGA |
69 |
1640 |
49 |
1145 |
29 |
0495 |
20 |
84 |
TOTAL |
1689 |
1174 |
515 |
ALP |
15 |
TOTAL |
1746 |
1001 |
745 |
1648 |
69 |
26 |
3 |
20 |
962 |
28 |
10 |
1 |
8 |
686 |
41 |
16 |
2 |
12 |
20 FootersControlled by Cargo |
Fleet Configuration & Actual ULDs Requirement for Operation |
Number of Aircrafts |
PIA's Wide Body A/C Fleet |
PLT Configuration (01 A/C) |
LD3 Configuration (01 A/C) |
B-777 |
B-74M |
747-3 |
A-310 |
TOTAL |
23 |
36 |
30 |
3 |
6 |
2 |
12 |
14 |
8 |
8 |
6 |
6 |
7 |
14 |
3 |
828 |
Fleet Requirement |
Hajj Operations |
Mango Season |
Freighter |
200 |
200 |
200 |
250 |
250 |
250 |
Additional Requirement |
Average 200 LD3s, 250 PLT |
Allocation Enhansement |
200 |
951 |
690 |
250 |
981 |
Additional Requirements just as 46 Wide Body Stations Enhanced Allocation plus, Freighter/Friut Seasons,) |
Enhansement Requests-STN |
951 |
989 |
2% Reserve for Repair |
Containers |
Pallets |
50 |
50 |
ULDs Type |
Over All Requirement |
2029 |
1971 |
2% Reserve for Repair |
50 |
50 |
Containers |
Pallets |
2029 |
0855 |
1971 |
1746 |
0970 |
1689 |
1174 |
1001 |
Planning Parameters & ULD INVENTORY STATISTICS |
![]() |
TOTAL |
1766 |
1010 |
756 |
X K L U D E |
ULD Manufacturers & Suppliers (IATA Registerd) |
ULD's Standard Specifications (IATA Technical Manual) |
Actual Operational Requirement |
Inventory in System (Since 1984) |
Available with Stations |
Shortage in System in # |
Shortage in System in % |
42% |
49% |
Engr. Abdul Razzaque Memon |
MCS(IT), BE (NED), PE(PEC), BA DM(PS)/P-46018 Incharge ULD HDQ Effective 05 May 2005 |
![]() |
Stations Enhanced ULD Allocations Pallets & Containers |
AAN |
ALA |
AUH |
BHX |
BAH |
BOM |
CDG |
CMB |
CPH |
DAC |
DEL |
DMM |
DOH |
DXB |
FCO |
FRA |
GLA |
HKG |
IAH |
ISB |
JFK |
JED |
BKK |
KHI |
KTM |
KUL |
KWI |
LHE |
LHR |
LYP |
MAN |
MCT |
MXP |
NBO |
NRT |
ORD |
OSL |
PEK |
PEW |
SIN |
RUH |
TIP |
SVO |
SPL |
YYZ |
URC |
UET |
06 - 08 |
04- 08 |
10 - 12 |
04 - 06 |
10 - 20 |
25 - 16 |
12 - 12 |
10 - 10 |
06 - 10 |
30 - 10 |
25 - 10 |
10 - 10 |
10 - 10 |
10 - 10 |
45 - 30 |
10 - 15 |
15 - 30 |
18 - 08 |
10 - 08 |
30 - 30 |
25 - 20 |
06 - 06 |
10 - 12 |
04 - 06 |
04 - 06 |
06 - 06 |
04 - 06 |
10 - 15 |
04 - 06 |
10 - 10 |
10 - 40 |
04 - 06 |
06 - 08 |
15 - 30 |
80 - 80 |
10 - 12 |
45 - 20 |
200 - 150 |
08 - 08 |
06 - 10 |
100 - 80 |
50 - 45 |
04 - 06 |
30 - 30 |
04 - 06 |
20 - 10 |
10 - 40 |
Units Engaged with Relief Goods |
10% |
31% |
ULD Operation is Being Manged with : |
48% |
20% |
Despite consistance, unrealistic, daily demands & Constant ULD SOP Violation, lack of planning at network stations & other odds due unawareness of ULD SOP, Functions, experience; ULD HDQ & its team in Shift operation, is just Managing ULD Operation with 48% LD3s & 20% Pallets & without any major mishap. Induction & Corrective measures (at STNs) are the only viable solution to the existing problems. |
Team Efficiency.........ULD HDQ (KHI)...(Automation) ULD Shifts (KHI-ISB-LHE-PEW) (Operation) |
Memon's Research Project & ULD Awareness Programme We Developed the Solution to your ULD Problems |
Now Its Your turn to go a head, We developed the Solution to your ULD Problems. Isn't it time you change to.? |