A
STUDY AND EVALUATION OF ADIABATIC SATURATION
PROCESS |
LIST
OF GRAPHS AND LIST OF FIGURES
|
LIST
OF GRAPHS
Graph
Description
Page
1
Result from Day 1
20
2
Result from Day 2
20
3
Result from Day 3
21
4
Result from Day 4
21
5
Result
from Day 5
22
6
Result
from Day 1 to Day 5
22
LIST
OF FIGURES
Figure
Description
Page
1
A plastic water pipes above the
collecting
13
basin
for the re-circulated water to be sprayed.
2
A duct connected to a blower/fan to
collect
13
and
distribute the saturated air.
3
The Forward Curved Blade Blower.
14
4
The exhaust which is connected from
the
14
blower.
This is where the saturated air exits.
5
Plastic water pipe used to spray
re-cycled water.
16
6
Adiabatic Saturator without cover.
17
7
Adiabatic Saturator with cover.
17
Sign
Guestbook | View
Guestbook
|