MPR027 - GROUP 3 - BIKE PUMP PROJECT
THE PRODUCT THE PROCESS
SCHEDULE & WBS
GROUP INFO
HOME
GOALS
FINAL PRESENTATION
PROJECT DESCRIPTION

The purpose of this project is to design and build a
Product consisting of a minimum of five parts.  The product must be partly manufactured and assembled in a totally automated system containg a CNC Lathe and two robots, a Motoman UP-6 and a Hitachi A3020.  Our robot system or Cell, as its refered to, must be completely operational by December 10th.
View our final oral presentation including video clips of the cell.
LULEÅ UNIVERSITY OF TECHNOLOGY
University Campus, Porsön, 97187, Luleå
Tel +46 (0) 920-91000 Fax +46 920-91399
University@luth.se
THE PRODUCT
Get a full description of the product parts and functions.
Group Meeting
Some product and fixture prototypes.
QUESTIONS OR CONSERNS....
Leave us a message
SCHEDULE & WBS
Take a look at whats to came as well as a detailed description of our Work Breakdown Structure
THE PROCESS
Take a walk through the entire production process, start to finish, with video's and pictures.
Johan tells it all, without the drawings.
PRODUCT AND PROJECT GOALS
VIEW VIDEO OF ENTIRE CELL
Get a description of the group's goals for the product itself, as well as what they plan to get out of this project
2.2 M .avi file - may take a few minutes
GROUP INFO.
Meet the group members.