Location: The line is located in Central Ontario, extending
between the communities of Port McNicoll on Georgian Bay,
and what was once known as Dranoel (just north of Millbrook near
Bethany) on the Havelock Subdivision of the
Canadian Pacific Railway.
History: During the late 1800's, one of the chief commodities
to be shipped by rail from the growing prairie lands in
western Canada east to Ontario and Quebec was wheat. The demand
itself peaked during the harvest season, tying up all
available cars and creating congestion both on main lines and
in the larger urban areas. Hoping to alleviate the situation,
the
Canadian Pacific reviewed the alternatives available, options
that included the construction of a French River canal and
obtaining running rights over Grand Trunk tracks. By 1903, it
was decided that a new rail link would be the most feasible
answer, possibly entailing the construction of new terminal facilities.
Later that year, definitive routes were investigated that
ultimately led to the incorporation of the Georgian Bay &
Seaboard Railway (GB&SR) in April 1905, essentially a CPR
paper company. The new terminal site chosen on Georgian Bay was
located on lands opposite the community of Victoria
Harbour. All construction was to be of high standards with favourable
grades and curves in order to improve shipment
times.
In April 1907, a construction contract was let to the Toronto
Construction Company for the section of line extending from
Coldwater west to the new harbour site. Here, construction commenced
on modern terminal facilities that included a grain
elevator, wharf and sheds connected to the main land by a large
trestle over Hog Bay. This section of track was opened
for service as of June 1909. The site chosen for the eastern terminus
of the railway was a point on the CPR Toronto to
Montreal line near Bethany south of Lindsay to be named Dranoel.
As construction began on this portion of the line,
formal arrangements were made permitting the lease of the GB&SR
to the CPR for a period of 999 years commencing in
1910. The name chosen for the new port was Port McNicoll. The
railway east from Coldwater to Atherly (near Orillia)
was completed by December 1911 while the remainder of the line
to Dranoel was finished in May 1912. The completed
route gave the CPR the ability to ship grain and other products
arriving at the new port in a very efficient manner to
Montreal. Port McNicoll became the primary harbour for the CPR
when all passenger and freight operations were
transferred from Owen Sound. Some consideration was given to extending
the line south to Cobourg, however, this never
took place. The GB&SR disappeared as a corporate entity in
1956.
Approximate Mileage: 88 miles.
Current Status: The line was divided into the Port McNicoll
and Bobcaygeon Subdivisions. The section from Lindsay to
Orillia was abandoned in September 1937, from Coldwater to McMillan
in March 1976, from Uthohff to Orillia in 1985,
from McMillan to Port McNicoll and Lindsay to Dranoel in 1987,
and from Uthohff to Coldwater in 1992. All rails have
been removed.
Principle Stations: Port McNicoll, Coldwater, Orillia, Brechin, Lindsay and Dranoel.
Remaining Stations: A total of five GB&S stations have
survived. They are as follows:
1. Orillia: In original location at the foot of Mississaga Street
East on the lake front.
2. Brechin: In original location on Highway 12 at Concession 3
(Mara Township).
3. Eldon: In original location on Highway 46 (Part Lot 17, Con.
2, Eldon Township).
4. Balsam Lake: Moved to property behind former general store
in Lorneville.
5. Grass Hill: Moved to a farm property three miles east of Oakwood.
-About us-|-Archives-|-Benefits-|-Crew Center-|-Collective Agreement-| |
-C.R.O.R.-|-Diesel Dr.-|-Divisions-|-Editorials-|-Federal Legislation-| |
|
-Local Agreements-|-Members-|-Photosection-|-Quiz-|-Timetable- |
-Web Directory-|-Welcome-|-What's New-|-Your Voice-|-Store- |