Study 28 DEC 06 INTRO STOCK    SYSTEM FLOW   HDQ STRUCTUR UCM/SCM formats HANDLING SOP ULD OPN/SHIFT ULD Staff FAQ's HOME   AboutMe
Now Its Your turn to go a head!.  I had developed the Solution to your ULD Problems.
Is n't it time you change to.
Manager ULD central Control
Engr.A. Razzaque Memon
Manager ULD Central Control
MCS(IT) - BE (Electronics)
P.E (PEC) - B.A (Hum)
Cerified Quality Manager
CILT - Pakistan
ULD    MANAGEMENT   SYSTEM
Only I .T Versant MBA's are Required for Replacement to ensure Smooth ULD Handling
Capt. Muhammad Aijaz Haroon
Managing Director
Pakistan International Airlines
Memo's ULD Awareness Program
Last Update: 17 December 2008
Free ON-LINE Training
ON JOB TRAINING (OJT)
Organizational Process
Work Place Condition
Latent Conditions
Active Failure
Defences
Remarks
Planning, Monitoring, Control, Correcting System & Resources Support
(Man/Machine)
Induction of IT Versant MBA's in Central Control & Incharges in shifts, On Job Trainings
No ULD Vision to PHS, Under Staffing, No IT Support, detachment of trained people
Involvement of inexperienced & unnecesarly herdeles  due no job knowledge.
Only Operational understang to PHS people at all level, Do not want to understand, doing short term unprofessional decisions to pleased Top Management
Traditinally only MD PIA's direct involvement will bring betterment.
(Like All past MD's)
RISK CONTROL / MITIGATION LOG
Risk
References
Generic Hazards
Risk(s) Descriptions
Current Measures to Reduce Risk(s) & Risk Index (a)
Further Actions to Reduce Risk(s) & Resulting Risk Index (b)
Responsibilities
ULD/01
Reduction of ability to perform ULD functions




RISK INDEX
         (a)  3A
         (b)  1A

RISK TOLERABILITY
(a) Unacceptable under the existing Circum stances
Planning




Vision About UMS



Evaluation




OJT/Class Trainings




IT Support
Weekly ULD Status by the Manager ULD Central Control to All Station manager for advance planning & avoiding over accumulation of ULDs.

Time to time online understanding to PK Network.


Repeat understanding to SM JIAP's & entire team,  due rapid changes  to  understand ULD operation / ULD Management & Evaluate/support..

JIAP Officers / Staff are trained by ULD Central Control.



02 AVIVA Software are installed, 02 More are the Minimum Requirement.
MRO/MPH  to ensure same is strictly complied by Stations.



Manager Training & Development plan Schedule trainings & OJT for all level PHS People.

KK's /MRO / MPH / MFH to  understand ULD Management system & involve Manager ULD CC for any ULD related issue.

SM JIAP /SSMs / DSM Ramps
MRO/MPH & Manager Training & Development to ensure all PHS staff are madatory trained.

IT Support JIAP/ Manager IT Support & Network / MRO
GM PHS  / Director ASD



GM PHS / GM Cargo / DAS/DM


GM PHS / Director ASD



GM PHS / Director ASD



GM IT Support & Network / Director IT
ULD/02
Shortage of required Resources
Manpower, equipment, Support.
Constant efforts in process to seek support
SM /SSM JIAP /MRO to ensure availability.
GM PHS / Director ASD.
ULD/03
ULDs Damage & Repair
Mishandling & Non Standarised repair.
PHS & Carogo & TGS & All Monitoring teams MIS, CQA,  FLT Safety QMaintenace are notified
MRO / Manager maintenance TGS to Ensure Repairing as per FAA/SAFA/IOSA  etc Standards.
GM PHS GM Cargo / Director ASD.
ULD/04
LOSS OF ULDs,
Stations Inventory
Network Stations are notified for formated & timely UCM's / SCM's.
Manager's/Station Manager's / agents.
GM PHS / GM Cargo Director ASD.
ULD/05
Injuries to Field staff
Old Equipment, understaffing, No rest.
SM JIAP/MRS/SSMs/ MFH & DSM Ramps are sought attentions.
Manger Project /SM JIAP, SSM/ DSM Ramp & Manager Foreign Handling
GM PHS / Director ASD. Safety Department
INDUSTRY PROBLEMS?
(A)  IMBALANCE
(B) 
MAINTENANCE
(C) 
WEIGHT
(D)
PEAK SEASON
(E)
PRODUCT
Product Information
(a)  Structure
(b) 
Material Composition
(c) 
Durability
(d)
Collapsibility
(e)
Pricing
PRODUCT INFORMATION
STRUCTURE:
PK ULDs are designed to be with an FAA approved aluminum pallet and net. A collaspsed ULD is recected and placed on top of an aluminum pallet, loaded with cargo, and then secured to the pallet with a net. The pallet & Net system provides the structural support required by the FAA to protect the aircraft during rough flight conditions. The pallet and net system is widely used throughout the world to ship freight when ULDs are unavailable.
MATERIAL COMPOSITION
PK ULDs are constructed with water repellent extruded polypropylene and nylon straps with double D-ring enclosures. Extruded polypropylene is lightweight, specially designed for repeated bending and will not easily tear. The polypropylene used by PK complies with the material flammability requirements specified in Federal Aviation Regulation 25.853(a) Appendix F, Part I, paragraphs (a)(1)(v) and (a)(2)(iv). It also contains UV inhibitors to reduce degradation from ultraviolet rays.

DURABILITY



COLLAPSIBILITY





WEIGHT



PRICING






SUMMARY