Drywall started. It makes a big difference in how it looks. Already have
several of the bedroom ceilings and some walls put in place. They put all
of the drywall up in the new Breakfast Room.
Wrapped up the small fixes from the insulation inspection.
Pulled down the all the plastic wrapped around the stairway -- will be
replaced with drywall today -- and not needed since the addition upstairs is now
insulated and heated.
Put in 2 electrical boxes for the Cat-5 wiring termination in the
office closet and pulled all 16 wires through the boxes.
Masons attached the coax cable to the new TV antenna and put the
antenna up on
the rotator. Fixed the bricks on the side of the chimney -
stair-step pattern was not complete next to the house. They finished by
"acid washing" the chimney to clean it up and then they took down their
scaffolding.
Margaret bought ceramic tiles to "spice" up the 3 new
bathrooms. Will have white tiles put around the tub (3' x 6' x 3') and on
the floor. She has designed patterns with color tiles and/or picture tiles
for each of the 3 new bathrooms.
|